Timing operation. (Time Out)
To start timing, first apply air to port #3. the 5/2 valve will immediately shift.
Now exhaust the air to port #3. This will start the time out process.
When all of the air has exhausted from port 3 the 5/2 way valve will shift back.
For longer timing ranges, volume may be added to port #2.
