Timing operation. (Time Out)
To start timing, first apply air to port #3. The remote air piloted valve connected at
port 1A will immediately shift
To begin timing vent the air to port #3
At the end of the timing cycle port 1A will vent the pilot signal to the remote spring return pilot valve.
To reset and start another timing cycle again apply air to port #3.
For longer timing ranges, volume may be added to port #2.